  2. Good afternoon,

    Is there any way in P6 can compare deviation Total Float between two schedules( current and baseline?) P6 shows an option for Total Float and BL1 total float, but there is not a variation between them. Even using defined fields and global change I couldn't figure it out. Would you help me with this?

    Thanks,

    Abilio Neto

    ReplyDelete