Showing posts with label Resources. Show all posts
Showing posts with label Resources. Show all posts

Friday, November 24, 2017

Primavera P6 and Resource Codes Explained

Primavera P6’s resource codes are helpful for sorting resource databases, which can become cluttered with an abundance of resource definitions.
Once created and assigned resources become an important fixture in the scheduling historical record. Resources are meant to be permanent database elements, and resource databases are therefore, generally, large and difficult to sort through. Resource codes, however, make it possible to sort resources by your desired category.

This article demonstrates how to employ resource codes to sort a Primavera P6 Professional resource database.

Read the post on TenSix

Thursday, November 9, 2017

Primavera P6 and Material Resources

In Primavera P6 Professional it is possible to define labor, equipment, and material resources. Material resources require definition of a unit of measure.
Labor resources may be trade skills or specific individuals. Typically, the trade skill is inserted as a place holder until the resource manager assigns an individual to perform the work. It is important to specify the labor hourly pay rate and maximum units/time. The labor maximum units/time is how many trade specific individuals are available to work on the project. Equipment resources have a standard rate.

read on Ten Six